Portable Cabin in Nanjangud — Office, Security, Site Cabins
The first decision when choosing a portable cabin in Nanjangud Industrial Area is where it will work. At a running factory, a dispatch clerk may need a window facing the loading bay and a door clear of truck movements. On a new plot in Thandya or Immavu, the first cabin may have to serve as the engineer's office now and a guard room later. Porta Cabin Systems builds steel cabins in Bangalore and supplies both types of site via Mysuru.
Choosing a portable cabin for a Nanjangud plant or a new Thandya plot
Operating factory:
• First use — Inspection office, dispatch counter or lockable store
• Where to place it — Keep the entrance clear of loading and shift traffic
• What to put on the drawing — Counter height, window direction, racks and sockets
• Handover and later use — Choose a lifting window outside peak dispatch hours
New industrial plot:
• First use — First room for the site supervisor, engineers or guard
• Where to place it — Allow for future shed access and the permanent gate
• What to put on the drawing — Desk space, drawing table, visitor seating and utility connections
• Handover and later use — Plan a prepared position where the cabin can later serve as a gate office or store
Room plans and headcounts by size
A portable security cabin needs sightlines from the guard's chair to the gate. For a logistics office, plan a counter where drivers can hand over challans while the clerk updates records. A supervisor's office needs sockets and lighting where the desks will stand. For a store, check the doorway and aisle against the largest spare or packing item. A labour rest cabin can provide a covered shift-change area. If the layout includes an attached toilet, identify water and drainage connections before placement.
Size — example use:
• 10 × 10 ft — A gate guard, a compact store or a desk for the site supervisor — roughly 1–2 people
• 20 × 10 ft — A project office seating roughly 3–5 people, or fewer people plus a partitioned corner for meetings
• 40 × 10 ft — A bigger team's office, a canteen layout, or office and store under one roof
• G+1 — More floor area where the plot is tight. Plan room for the stairs, the landing and the supports it needs.
The headcounts are layout examples. Confirm furniture positions, clearances and partitions on the 2D drawing.
What it is made of, and what comes fitted
Our standard cabin is 10 × 10 × 8.5 ft. Its frame is mild steel (MS), clad in corrugated MS sheet on the walls and over the roof. It leaves our works with a steel door, glazed windows, a fan, lights, switches and sockets in place. Its outside steelwork is primed, then painted.
Options include extra windows, a glass front, internal partitions, a toilet, AC provision, extra sockets and exterior branding. The approved drawing records your selections.
Buying online or hiring for a set term
Line up the sizes with the fittings kept the same: an open-plan 20 × 10 ft office and a partitioned one with a toilet are priced differently. Before you pay, check the chosen model's price, how GST applies to it, the transport charge and the crane arrangement. Buy Now takes you to checkout; Add to Cart puts the cabin in your basket to look over first.
Buying suits an office or store that stays in use when construction finishes. The cabin can be relocated to another prepared position with lifting access. Renting can suit a contractor working on a fixed-term build. Check rental availability for the required size, start date and duration.
Fabrication runs 10–15 working days once the drawing is approved and the advance is paid. It then travels by road from Bangalore and is set down by crane. Before it leaves, tell us which gate receives it, where it will be lifted and the hours trucks may enter. On a new plot, check that the base is ready and power is on hand. In a running plant, agree the placement slot with the dispatch team. With the office cabin in position and the power connected, your team can start using it that same day. See the Nanjangud porta cabin delivery guide for site preparation.
A cabin you buy from us carries a 5-year structural warranty and a 1-year warranty on the electrical fittings and hardware we supply. The structural cover stays valid while the paint finish is looked after and surface rust is treated before it spreads. Near a loading bay, check the corners for chipped paint now and then, and keep rainwater draining away from the base.
GSTIN 29BHNPA6577M1ZK • Udyam UDYAM-KR-02-0053512
Sites we serve around Nanjangud and Mysuru
PCS serves Nanjangud, Thandya, Immavu, Kadakola, Kochanahalli, Adakanahalli and Thandavapura. Mysuru-area coverage includes Hebbal, Hootagalli, Belagola, Belawadi and Metagalli. Nearby towns include T. Narasipura, Gundlupet and Chamarajanagar. Delivery arrangements depend on access at the receiving site.
Delivery charges
Delivery charges for online orders, including GST
Delivery to
Charge incl. GST
Up to and including 50 km by road from our yard
₹1,000
Beyond 50 km, in Karnataka and Tamil Nadu
₹18,000
Andhra Pradesh, Telangana, Kerala and Puducherry
₹28,000
Elsewhere in India that we serve
₹45,000
Charged at checkout when you buy online. Rates include GST and cover transport with standard loading at our factory. Unloading, positioning and installation at your site are optional, at ₹15,000 including GST, added only if you choose them.
In Karnataka and Tamil Nadu, the first two rates depend on the road distance to your exact address. It is not measured at checkout at present, so delivery to an address in Nanjangud Industrial Area is confirmed in a quotation.
Delivery is confirmed in a quotation instead when a PIN code cannot be verified, and for Lakshadweep and the Andaman and Nicobar Islands. On an order placed through a quotation, transportation is arranged and quoted based on the delivery location and site access. Full terms: Shipping & Delivery Policy.
FAQs
For a guard or a supervisor on their own, 10 × 10 ft can be enough. Go up to 20 × 10 ft once engineers need a drawing table and room to meet contractors. Before choosing its spot, mark where the permanent gate and the shed entrance will go.
The cabin must sit on a firm, level base. We work out the supports your soil and your chosen layout call for — most of all for a G+1 unit.
Your cabin is in fabrication for 10–15 working days from when the drawing is approved and the advance is paid. We count Monday to Friday only, skipping Karnataka public holidays. Its arrival date then turns on the haul from Bangalore and on whether your plot can take a truck.
That comes down to stock at the time. Share the cabin size, how many months the build runs and where the plot sits, and we will tell you what we can send on rent.
Listed prices and ordering
The catalogue models this guide mentions, each showing its own size, fittings and price.