Skip to main content
Porta Cabin SystemsPorta CabinSystems

GSTIN: 29BHNPA6577M1ZK

G+1 Labour Accommodation Block

Two-storey (G+1) portable labour accommodation block — multiple insulated rooms over two floors with an external staircase, balcony walkway and configurable fit-out.

₹46,61,000 grand total

incl. GST

Availability
Made to order
Lead time
Approximately 7–15 working days (subject to size and order)
Warranty
Warranty as per the approved quotation.

Overview

A double-storey (G+1) portable labour accommodation block built from insulated steel modules — a row of rooms on each floor served by an external staircase and a first-floor balcony walkway, under a gabled canopy roof, with louvre-ventilated walls and a window to every room. Raised on pedestal footings and delivered ready to occupy. The interior shown is fitted out as an open admin / office space with workstations, storage and PPE stations; layouts (dormitories, offices, mess, washrooms) are configured to your headcount, and colours, room count and fit-out are customisable. The staging and surroundings shown are illustrative. Built for construction sites, plants, mines and large projects across India.

Applications

  • Construction site accommodation
  • Labour / worker housing
  • Plant & mine camps
  • Project offices & dormitories

Standard inclusions

  • G+1 double-storey structure
  • External steel staircase
  • First-floor balcony walkway
  • Insulated wall & roof panels
  • Windows & louvre ventilation to each room
  • LED lighting & electrical points
  • Pedestal footings

Specifications & materials

Final materials always match your approved quotation, drawing and purchase order.

Structure

Configuration
G+1 (ground + first floor) modular block on a steel frame with pedestal footings and an external staircase

Walls

Wall & roof
Insulated PUF / sandwich panels; gabled canopy roof for weather protection

Rooms

Layout
A row of rooms per floor — configurable as dormitories, offices, mess or washrooms

Access

Circulation
External steel staircase and a first-floor balcony walkway with railing

Ventilation

Air
Windows and wall louvre vents to each room; AC-ready

Interior

Fit-out
Fit-out to requirement — the unit shown is an open admin / office layout with workstations and storage

Electrical

Fittings
LED lighting, fan and power points, distribution board; AC provision

Amenities

Options
Washroom, kitchen / mess and PPE-station options; fire-extinguisher points

Technical Material Specifications

Standard construction specification for this cabin range. Materials and specifications vary according to cabin type, size, approved design and customer requirements. Final construction details will be confirmed in the official quotation.

Bottom Frame
100 × 50 mm formed MS C-channel, 5 mm thick
Bottom Stiffeners
100 × 50 mm, 80 × 40 mm and 50 × 50 mm square pipes
Top Frame
Frame made from 50 × 50 mm square pipe, 2 mm thick
Top Stiffeners
50 × 25 × 1.4 mm square pipe
Side Posts
50 × 50 × 1.6 mm square pipe
Side-Wall Stiffeners
50 × 25 × 1.4 mm square pipe
External Wall Panelling
Specially corrugated Corten steel sheet, 1.2 mm thick
Internal Wall Panelling
7.3 mm pre-laminated MDF board
External Roof
1.2 mm-thick MS steel sheet, properly sloped and made watertight to form the roof
Bottom Flooring
18 mm cement-bonded fibre sheet, resistant to water, termites and dimensional changes, finished with LG-make vinyl carpet
MS Door
25 × 25 mm MS frame with 1.2 mm corrugated sheet
Insulation
Roof: 50 mm glass wool; Walls: 12 mm Armaflex
Wiring
Concealed wiring using FR-grade insulated copper wire of ISI-approved Polycab or Finolex make
Electrical Fittings
220–240 V AC, 50 Hz electrical fittings, including Wipro LED lights
External Painting
Phosphating treatment, one coat of primer and two coats of corrosion-resistant synthetic Nerolac paint
Lifting Hooks
Specially formed hooks for convenient lifting and shifting

Available sizes

Custom sizes are built to order — share your requirement for an exact layout.

  • G+1 double-storey block· multi-room; room count & layout built to headcount
Request a custom size

Delivery, warranty & drawings

Manufacturing

Approximately 7–15 working days (subject to size and order)

Delivery

Delivery across Karnataka and India; transportation quoted separately.

Warranty

Warranty as per the approved quotation.

Reviews

No reviews yet. Be the first to review this product.

    Write a review

    Reviews are moderated and published after approval. Please share genuine feedback only.

    You may also like

    Related products

    Interested in the G+1 Labour Accommodation Block?

    Tell us your size, quantity and delivery location and we will prepare a tailored quotation — customisation welcome.

    Send us your requirement

    Share a few details and we will get back to you with the right options.

    CallWhatsAppGet Quote